AI data centers are not standard construction projects. A single campus can include dozens of buildings, each 250 feet by 750 feet, standing 90 feet tall. The cooling infrastructure alone for one of these facilities requires hundreds of thousands of pounds of precision-cut stainless steel tube. The contractors building these campuses need fabrication partners who can absorb that volume without bottlenecking the construction schedule.
We've already done this work. We processed 16 full truckloads of stainless steel, sourced from Philadelphia, for a single AI supercomputer cooling project in Sacramento. Every piece was cut, slotted, and etched to spec on our tube laser systems and delivered on schedule. That project is not on our wish list — it's in our production history. And the demand for this type of work is accelerating as Oracle, Tesla, and other major operators break ground on new campuses across the country.